Skip to main content

ISABELLA FISH FLOW LLC POWER PLANT CONNECTION TO SCE AT MAIN DAM

Add two poles and lines to upgrade the SCE power line to the existing Isabella Lake hydroelectric plant.

Project Summary

Last Updated: 5/21/2014