Skip to main content

Ferguson Slide Talus Removal Project

This Project will consist of stabilization of the rock talus and debris slide via installation of a cable net drapery system, and removal of rock talus and debris from below the origination point of the slide.

Project Summary

Last Updated: 9/18/2014