Fresno and Madera Counties Italian Bar Bridge Replacement
Fresno/Madera Counties are proposing to replace Italian Bar Bridge crossing the San Joaquin River. The existing bridge is 241 feet long and 12 feet wide between the railings and is classified as both structurally deficient and functionally obsolete.
Project Summary
Location Summary:
Italian Bar Bridge crossing the San Joaquin River / Redinger Lake near SCE Powerhouse #3.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 08/21/2017 |
| Comment Period | 10/03/2017 |
| Decision | 12/2017 (Estimated) |
| Implementation | 04/2018 (Estimated) |
Expected Analysis Type:
Environmental Assessment
Special Authority:
Not Applicable / Other
Lead Management Unit:
Sierra National Forest All Units
Notice and Comment Regulation:
218 (2013) Non-HFRA
Project Purpose:
Special Use Management; Road Management
Project Activity:
Special Use Authorizations; Road Improvements/Construction
Current Status:
Completed
Project Decision Information
SUP Issuance for the Italian Bar Road Bridge Replacement Prjt Construction
Decision Signed Date: 12/19/2017
Forests:
Sierra National Forest
Districts:
Sierra National Forest All Units
States:
California
Counties:
Fresno; Madera
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Annette Lambert
1600 Tollhouse Road
Clovis, CA 93611-0532
559-855-5355 x3338
alambert@fs.fed.us
Last Updated: 3/29/2018