Pend Oreille Public Utility District: Metaline Falls Water System upgrade
The P.O. PUD has proposed installing approximately 800 feet of water pipeline to replace a section of pipe leaking treated drinking water. The pipeline would be installed in an abandoned portion of County Road 302 (Sullivan Lake Road).
Project Summary
Current Status:
Completed
Location Summary:
In portion of old Sullivan Lake Road 302
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 05/15/2013 |
| Comment Period | 05/15/2013 |
| Decision | 07/2013 (Estimated) |
| Implementation | 07/2013 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Sullivan Lake Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Project Decision Information
Metaline Falls Waterline Maintenance Project
Decision Signed Date: 07/09/2013
Legal Notice Date: 07/09/2013
Forests:
Colville National Forest
Districts:
Sullivan Lake Ranger District
States:
Washington
Counties:
Pend Oreille
Legal Land Description:
Lot 7, sec. 22, T.39N., R.43E., W.M.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Karen Nooney
12641 Sullivan Lake Road
Metaline Falls, WA 99153
509-684-7189