Skip to main content

AUSTIN RANCH DIVERSION PROJECT

Removal of the existing diversion pipe and installation of pre-fabricated steel headgate and pipe that will provide positive irrigation control, reduce channel disturbance, and meet current fish passage requirements for ESA listed fish.

Project Summary

Last Updated: 7/19/2013