AUSTIN RANCH DIVERSION PROJECT
Removal of the existing diversion pipe and installation of pre-fabricated steel headgate and pipe that will provide positive irrigation control, reduce channel disturbance, and meet current fish passage requirements for ESA listed fish.
Project Summary
Location Summary:
.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 06/05/2013 |
| Comment Period | 06/05/2013 |
| Decision | 07/2013 (Estimated) |
| Implementation | 08/2013 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (7), 36 Cfr 220.6(E)(7)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Blue Mountain Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Wildlife, Fish, Rare Plants; Watershed Management
Project Activity:
Species Habitat Improvements; Species Population Enhancements; Watershed Improvements
Current Status:
Completed
Project Decision Information
Austin Ranch Diversion Project Decision
Decision Signed Date: 07/12/2013
Forests:
Malheur National Forest
Districts:
Blue Mountain Ranger District
States:
Oregon
Counties:
Grant
Legal Land Description:
T11S, R28E, Sec. 22, NWNW; Willamette Meridian
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Daniel Armichardy
P.O. Box 909
John Day, OR 97845
541-575-3391
darmichardy@fs.fed.us
Last Updated: 7/19/2013