Skip to main content

OTEC and OTC 395 to Fall Mountain

Oregon rail Electric Cooperative (OTEC) to replace overhead line with buried line within existing corridor and road prism. Oregon Telephone Corporation will co-locate fiber conduit at the same time.

Project Summary

Last Updated: 4/20/2021