Quinault National Recreation Trail Repair and Reconstruction
Repair and reconstruct approximately 6.2 miles of trail, including some tread relocation and minor reconstruction, replacement of gravel surfacing, and drainage structure repair.
Project Summary
Location Summary:
The Quinault Recreation Trail (Tr) System is adjacent to the South Shore of Lake Quinault: Lodge Tr #850, Quinault Loop Tr #854, Quinault Rain Forest Tr. #855, and Gatton Creek Tr. #88.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 01/01/2009 |
Decision | 12/2016 (Estimated) |
Implementation | 08/2017 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.12 (4), 36 Cfr 220.6(D)(4)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Pacific Ranger District / Quinault
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Recreation Management
Project Activity:
Trail Management
Current Status:
Completed
Project Decision Information
Quinault National Recreation Trail Repair and Reconstruction
Decision Signed Date: 12/12/2016
Forests:
Olympic National Forest
Districts:
Pacific Ranger District / Quinault
States:
Washington
Counties:
Grays Harbor
Legal Land Description:
T23N, R9W, Sec 21, 29, 30, 32, Willamette Meridian.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Molly Erickson
437 Tillicum Lane
Forks, WA 98331
360-374-1233
mjerickson@fs.fed.us
Last Updated: 12/19/2016