Lower Big Quilcene Trail Bridge Replacement
This project would replace four trail bridges on the lower Big Quilcene trail. Bridge sites would remain in their existing locations. New bridge structures may be flown in.
Project Summary
Location Summary:
The Lower Big Quilcene Trail (#833) starts six miles southwest of Quilcene on FS Road 2700-080. Bridge sites are at approximately 1.0, 2.0, 2.5 and 5.0 miles along the Lower Big Quilcene trail.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 07/27/2010 |
Decision | 09/2010 (Estimated) |
Implementation | 07/2011 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (1), 36 Cfr 220.6(E)(1)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Hood Canal Ranger District / Hoodsport
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Recreation Management
Project Activity:
Trail Management
Current Status:
Completed
Project Decision Information
Lower Big Quilcene Trail Bridge Replacement
Decision Signed Date: 09/30/2010
Forests:
Olympic National Forest
Districts:
Hood Canal Ranger District / Hoodsport
States:
Washington
Counties:
Jefferson
Legal Land Description:
The trail passes through T27N, R02W, sections 32, 31, 30, 19; and T27N, R03W, sections 24, 13, and 14.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Jennifer Fujii
295142 Highway 101 S.
Quilcene, WA 98376
360-765-2251
jfujii@fs.fed.us
Last Updated: 12/15/2010