Rocky Brook Hydroelectric Permit Renewal
Rocky Brook Hydroelectric Limited Partnership is seeking a new 20-year special use permit for their existing facilities. The project diverts up to 40 cubic feet per second (cfs) from Rocky Brook, with a minimum in-stream flow of 5 cfs.
Project Summary
Location Summary:
Rocky Brook, at approximately river mile 0.5.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 04/02/2012 |
Decision | 12/2013 (Estimated) |
Implementation | 12/2013 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (15)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Hood Canal Ranger District / Quilcene
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Cancelled
Forests:
Olympic National Forest
Districts:
Hood Canal Ranger District / Quilcene
States:
Washington
Counties:
Jefferson
Legal Land Description:
T26N, R02W, Sec 21, Willamette Meridian.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Joel Nowak
295142 Highway 101 S.
Quilcene, WA 98376
360-765-2251
joelnowak@fs.fed.us
Last Updated: 3/25/2015