Quinault Admin Site Waterline Repair/Replacement
We will dig an 18-24" deep trench using a ditch witch, replace failed water lines throughout the compound, install 7 new water sub meters, and coordinate relocation of the compound's main water meter.
Project Summary
Location Summary:
Quinault Ranger Station Compound Facility
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 09/05/2013 |
Decision | 09/2013 (Estimated) |
Implementation | 10/2013 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.12 (5), 36 Cfr 220.6(D)(5)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Pacific Ranger District / Forks
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Facility Management
Project Activity:
Facility Maintenance
Current Status:
Completed
Project Decision Information
Quinault Admin Site Waterline Repair/Replacement
Decision Signed Date: 09/06/2013
Forests:
Olympic National Forest
Districts:
Pacific Ranger District / Forks
States:
Washington
Counties:
Grays Harbor
Legal Land Description:
23 N / 9 W / 20
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Jasmine Budrow
437 Tillicum Lane
Forks, WA 98331
360-956-2295
jlbudrow@fs.fed.us
Last Updated: 3/28/2014