Storm Damage FSR 3000-200
Stabilization of storm damage to include: removing the failed culvert, pullback and stabilizing the eroded embankment, berming each side of the repair area, and creating cross drains to divert water away from the site.
Project Summary
Location Summary:
Located at milepost 5.3 on Forest Service Road 3000-200. Work Site is located about 30 miles northeast of Forks, WA, in the Deep Creek watershed.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 07/26/2016 |
Decision | 08/2016 (Estimated) |
Implementation | 09/2016 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.12 (4), 36 Cfr 220.6(D)(4)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Pacific Ranger District / Forks
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Wildlife, Fish, Rare Plants; Road Management; Watershed Management
Project Activity:
Species Habitat Improvements; Road Maintenance; Travel Management; Watershed Improvements
Current Status:
Completed
Project Decision Information
Storm Damage FSR 3000-200
Decision Signed Date: 08/01/2016
Forests:
Olympic National Forest
Districts:
Pacific Ranger District / Forks
States:
Washington
Counties:
Clallam
Legal Land Description:
T30N, R11W, Sec 11, Willamette Meridian.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Bill Shelmerdine
437 Tillicum Lane
Forks, WA 98331
360-956-2282
bshelmerdine@fs.fed.us
Last Updated: 9/30/2016