T-Mobile Facilities Installation at Neilton Point Communication Site
Proposal by T-Mobile to install telecommunications facilities at the Neilton Point Communications Site consisting of a base transceiver located within a new 8 by 10 ft equipment shelter and placement of antennas on an existing monopole tower.
Project Summary
Location Summary:
Located at Neilton Point Communications Site, approximately 1.5 miles SE of Neilton, WA. Site is accessed by NFS Roads 2258000 and 2258040.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 03/21/2017 |
| Decision | 04/2017 (Estimated) |
| Implementation | 05/2017 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Pacific Ranger District / Quinault
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
T-Mobile Facilities Installation at Neilton Point Communication Site
Decision Signed Date: 04/11/2017
Forests:
Olympic National Forest
Districts:
Pacific Ranger District / Quinault
States:
Washington
Counties:
Grays Harbor
Legal Land Description:
T22N, R09W, Sec 18, Willamette Meridian.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Martha Krueger
437 Tillicum Lane
Forks, WA 98331
360-288-0278
marthafkrueger@fs.fed.us
Last Updated: 7/18/2017