Department of Natural Resources Timberland Access
The Washington State Deptartment of Natural Resources is proposing to access state land via National Forest System road 3030000 and a new spur approximately 1200 feet long.
Project Summary
Location Summary:
Approximately 6 miles southeast of Port Angeles, WA near the Little River.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 05/18/2017 |
Decision | 06/2018 (Estimated) |
Implementation | 07/2018 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Pacific Ranger District / Forks
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Department of Natural Resources Timberland Access
Decision Signed Date: 06/29/2018
Forests:
Olympic National Forest
Districts:
Pacific Ranger District / Forks
States:
Washington
Counties:
Clallam
Legal Land Description:
T29N, R6W, Sec 3, Willamette Meridian.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Joel Nowak
437 Tillicum Lane
Forks, WA 98331
360-956-2266
joelnowak@fs.fed.us
Last Updated: 6/29/2018