Department of Natural Resources Access Roads
Washington State Department of Natural Resources proposes to construct two new spur roads to access State timberlands. Lengths are 1030 feet and 1700 feet.
Project Summary
Location Summary:
Approximately 15 miles northeast of Forks, WA
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 05/18/2017 |
Decision | 06/2018 (Estimated) |
Implementation | 07/2018 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Olympic National Forest All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Department of Natural Resources Access Roads
Decision Signed Date: 06/29/2018
Forests:
Olympic National Forest
Districts:
Pacific Ranger District / Forks
States:
Washington
Counties:
Clallam
Legal Land Description:
T30N, R9W Sec 16 and 17; T30N, R11W Sec 15, Willamette Meridian.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Joel Nowak
1835 Black Lk Blvd SW
Olympia, WA 98512
360-956-2266
joelnowak@fs.fed.us
Last Updated: 6/29/2018