Ziegler Creek/Norwood Culvert Removal
Remove two culverts on Ziegler Creek, a fish-bearing stream in the Upper Quinault Valley. National Forest System road 2272170 is a short road crossing which is no longer needed. Culvert removal will restore channel conditions.
Project Summary
Location Summary:
Upper Quinault watershed, Ziegler Creek. Approximately 3 miles northeast of Quinault, WA.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 05/01/2017 |
Decision | 03/2018 (Estimated) |
Implementation | 04/2018 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (18), 36 Cfr 220.6(E)(18)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Pacific Ranger District / Quinault
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Watershed Management; Road Management
Project Activity:
Watershed Improvements
Current Status:
Completed
Project Decision Information
Ziegler Creek/Norwood Culvert Removal
Decision Signed Date: 03/23/2018
Forests:
Olympic National Forest
Districts:
Pacific Ranger District / Quinault
States:
Washington
Counties:
Grays Harbor
Legal Land Description:
T23N, R9W, Sec 10.
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Elizabeth Krier
437 Tillicum Lane
Forks, WA 98331
360-288-0230
eakrier@fs.fed.us
Last Updated: 3/30/2018