Skip to main content

Klahanie Campground Phase 1

Conduct analysis resulting in a sustainable recreation plan outlining actions to re-open the campground that provides access to sustainable and safe recreation opportunities. The project includes analysis of the following actions: Removal of a vault toilet, water pump, and recreation furniture including picnic tables and fire rings from the lower segment of the site that is located in the Calawah River floodplain.

Project Summary

Last Updated: 5/15/2025