Gold Beach Special Use Permit Renewals 2014
Renewal of nine existing expired special use permits. Re-authorization includes following uses: water transmission lines, tramways, driveways, and water storage facilities. No new construction or ground disturbance would occur.
Project Summary
Location Summary:
Locations spread-out throughout the Gold Beach District.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 03/13/2015 |
Decision | 09/2015 (Estimated) |
Implementation | 09/2015 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (15)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Gold Beach Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Gold Beach Special Use Permit Renewals 2014
Decision Signed Date: 09/03/2015
Forests:
Rogue River-Siskiyou National Forest
Districts:
Gold Beach Ranger District
States:
Oregon
Counties:
Curry
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Gary Einck
29279 Ellensburg Ave
Gold Beach, OR 97444
541-618-2037
geinck@fs.fed.us
Last Updated: 8/9/2018