An official website of the United States government
Here's how you know
Official websites use .gov
A .gov website belongs to an official government organization in the United States.
Secure .gov websites use HTTPS
A lock (
) or https:// means you’ve safely connected to the .gov website. Share sensitive information only on official, secure websites.
Note: Not all projects may appear on map. See list below for complete list of projects with more information or documentation.
NEPA Project Updates
Sign up to receive email updates about NEPA (National Environmental Policy Act) projects being planned in
Francis Marion and Sumter National Forests
SOPA Reports
The Schedule of Proposed Actions (SOPA) contains a list of proposed
actions for Francis Marion and Sumter National Forests that will soon begin or are currently undergoing environmental
analysis and documentation. It provides information so that you can become
aware of and indicate your interest in specific proposals. We encourage your
early and ongoing involvement in any proposals of interest to you.
One tract of National Forest System land (approximately 54.29 acres) would be exchanged for two separate private tracts (approximately 59.84 and 27.52 acres).
This project will salvage log two tracts near Morton Mountain and Long Mountain. Trees were damaged by Hurricane Helene (2024). Salvage logging is needed to provide economic benefits, reduce wildfire risk from fuels loading, and encourage forest regeneration.
The Forest Service is a cooperating agency to the USDA Rural Utilities Service, which is the lead agency for a proposal to construct a 115 KV powerline to McClellanville, SC.
Conducting herbicide treatments in and around recreational fishing lakes and ponds on the forest to control vegetation in ponds/lakes, on the dams and around the shore.
The Forest Service is proposing to harvest timber, improve stream and wetland habitat, decommission roads, improve recreation areas, and restore and maintain gullies on approximately 10,000 acres.
The Forest Service is proposing to do a combination of direct and indirect treatments to suppress and prevent infestations of forest pests and to salvage storm damage.
Henry E Brown Jr. is requesting a 50-powerline right-of-way to install approximately 3,200 linear feet of 1.5-inch copper cable and 0.5-inch fiber optic cable.
Vegetation Management in the form of silviculture treatments to include regeneration cuts, thinning and woodland establishment treatments on approximately 3,178 acres of national forest system managed land.
The Sumter National Forest is proposing to do maintenance and repair on approximately 6.2 miles of county jurisdiction roads that run through the Forest in Saluda County.
The Sumter National Forest is proposing to do maintenance and repair on approximately 6.2 miles of county jurisdiction roads that run through the Forest in Saluda County.
The project scope will include various engineering solutions such as widening and paving of shoulders, wider and brighter pavement markings, edgeline and centerline rumble stripes, RW clearing to improve roadway clearzone, flattening of roadside slop
Spectrum Southeast, LLC is requesting a Special Use Permit for placement of approximately 42,700 feet of fiber cable fiber optic cable to provide service to rural area in Greenwood, McCormick, Saluda and Abbeville Counties.
Project Archive
Some of our older projects can be accessed in our Project Archive.
Carbon stewardship
Climate change adaptation
Environmental justice
Facility management
Forest products
Fuels management
Grazing management
Heritage resource management
Land acquisition
Land management planning
Land ownership management
Minerals and geology
Projects that may affect wilderness (for mailing list contacts)
Recreation management
Regulations, directives, orders
Research
Road management
Special area management
Special use management
Unknown
Vegetation management (other than forest products)