Proposed Projects

Note: Not all proposed projects may appear on the map. See the list below for a more complete list.

Stay Informed

Sign up to receive email updates on National Environmental Policy Act (NEPA) proposed projects being planned on the Francis Marion and Sumter National Forests

The Forest Service follows NEPA regulations issued by the U.S. Department of Agriculture. Under this rule, Forest Service officials determine which proposed projects are shared for public input.

The agency no longer issues a schedule of proposed actions (SOPA) report. Below is the current list of proposed projects available for review—your opportunity to learn more, share feedback, and stay engaged in decisions that shape the future of our public lands.

Sort by:

Francis Marion and Sumter National Forests Proposed Projects

One tract of National Forest System land (approximately 54.29 acres) would be exchanged for two separate private tracts (approximately 59.84 and 27.52 acres).

This project will salvage log two tracts near Morton Mountain and Long Mountain. Trees were damaged by Hurricane Helene (2024). Salvage logging is needed to provide economic benefits, reduce wildfire risk from fuels loading, and encourage forest regeneration.

Renewal of existing Priority Use Outfitter Guide Permits on the Andrew Pickens Ranger District

This project is being cancelled. There are major changes with the project's proposed action, a new project will be created further down the road.

The Forest Service is a cooperating agency to the USDA Rural Utilities Service, which is the lead agency for a proposal to construct a 115 KV powerline to McClellanville, SC.

The Enoree District plans to relocate 6.3 miles of the Palmetto trail from forest service roads to the wooded area.

Conducting herbicide treatments in and around recreational fishing lakes and ponds on the forest to control vegetation in ponds/lakes, on the dams and around the shore.

The Forest Service is proposing to harvest timber, improve stream and wetland habitat, decommission roads, improve recreation areas, and restore and maintain gullies on approximately 10,000 acres.

The Forest Service is proposing to do a combination of direct and indirect treatments to suppress and prevent infestations of forest pests and to salvage storm damage.

Henry E Brown Jr. is requesting a 50-powerline right-of-way to install approximately 3,200 linear feet of 1.5-inch copper cable and 0.5-inch fiber optic cable.

Vegetation Management in the form of silviculture treatments to include regeneration cuts, thinning and woodland establishment treatments on approximately 3,178 acres of national forest system managed land.

Mountain bike and running events on existing trails and roads.

The Enoree Ranger District is proposing approximately 15,500 acres of timber harvest.

This project has been cancelled because it is a duplicate project

Federal Highways Bridge Replacement over Padgetts Creek.

The Sumter National Forest is proposing to do maintenance and repair on approximately 6.2 miles of county jurisdiction roads that run through the Forest in Saluda County.

The Sumter National Forest is proposing to do maintenance and repair on approximately 6.2 miles of county jurisdiction roads that run through the Forest in Saluda County.

Renewal of expired Special Use Permit for Sewee Visitors Center

The project scope will include various engineering solutions such as widening and paving of shoulders, wider and brighter pavement markings, edgeline and centerline rumble stripes, RW clearing to improve roadway clearzone, flattening of roadside slop

Spectrum Southeast, LLC is requesting a Special Use Permit for placement of approximately 42,700 feet of fiber cable fiber optic cable to provide service to rural area in Greenwood, McCormick, Saluda and Abbeville Counties.