Geotechnical Drilling
Three bridges need to be replaced on the Francis Marion and Long Cane Ranger Districts. Prior to replacing the bridges, borings need to be drilled to ensure proper support of the bridge designs.
Project Summary
Location Summary:
Two bridges on the Francis Marion and one bridge on the Long Cane, maps are in the project record
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 11/22/2024 |
Decision | 01/2025 (Estimated) |
Implementation | 05/2025 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (8), 36 Cfr 220.6(E)(8)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Francis Marion and Sumter National Forest All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Road Management
Project Activity:
Road Improvements/Construction
Current Status:
Completed
Project Decision Information
Geotechnical Drilling
Decision Signed Date: 01/10/2025
Forests:
Francis Marion and Sumter National Forests
Districts:
Long Cane Ranger District; Francis Marion Ranger District
States:
South Carolina
Counties:
Abbeville; Berkeley; Charleston; Edgefield; Greenwood; McCormick; Saluda
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Jason Campbell
4931 Broad River Rd.
Columbia, SC 29212-3530
000-000-0000
Jason.Campbell@usda.gov
Last Updated: 1/10/2025