Skip to main content

Peachtree Fiber Optic Line Installation

Permit Peachtree Broadband Fiber to install by burial 19,192 linear feet of fiber optic cable (approximately 3.64 miles) within the existing NCDOT rights-of-way (ROWs) of Hiwassee Dam Access Road (SR-1314) and Joe Brown Highway (SR-1326).

Project Summary

Last Updated: 7/23/2025