Kiamichi Electric - Powerline Installation
Overhead powerline installation, 6750 ft by 20 ft; 3 acres of land clearing; power pole installation; incidental timber harvest; utility service for property owner surrounded by National Forest System lands.
Project Summary
Current Status:
Completed
Location Summary:
Approximately 9 miles southwest of Hodgen, Oklahoma; along FS Road 6004 and A31.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 12/30/2016 |
| Decision | 03/2017 (Estimated) |
| Implementation | 04/2017 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Kiamichi Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Forest Products; Special Use Management
Project Activity:
Electric Transmission; Special Use Authorizations; Timber Sales (Green)
Project Decision Information
Kiamichi Electric Powerline Installation Project
Decision Signed Date: 03/10/2017
Forests:
Ouachita National Forest
Districts:
Kiamichi Ranger District
States:
Oklahoma
Counties:
Le Flore
Legal Land Description:
Section 27, T4N, R24E
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
John Reffit
111 South State Highway 259-A
Broken Bow, OK 74728
580-494-6402
johnareffit@fs.fed.us
Last Updated: 3/17/2017