F.S. Rd. 6016 Post Mountain Slab Repair
Removal of 12'X20'ft. slab and existing culverts. Culverts will be replaced back into the stream line covered with compacted material and 7 1/2" of concrete.
Project Summary
Current Status:
Completed
Location Summary:
Post Mountain
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 08/04/2017 |
| Decision | 08/2017 (Estimated) |
| Implementation | 08/2017 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (18), 36 Cfr 220.6(E)(18)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Kiamichi Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Road Management
Project Activity:
Road Maintenance; Road Improvements/Construction
Project Decision Information
F.S. Rd. 6016 Post Mountain Slab Repair
Decision Signed Date: 08/24/2017
Forests:
Ouachita National Forest
Districts:
Kiamichi Ranger District
States:
Oklahoma
Counties:
Le Flore
Legal Land Description:
T4N, R25E, Sec.31
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Kevin Wagner
111 South State Highway 259-A
Broken Bow, OK 74728
580-494-6402 x111
kevinwagner@fs.fed.us
Last Updated: 8/24/2017