Skip to main content

F.S. Rd. 6016 Post Mountain Slab Repair

Removal of 12'X20'ft. slab and existing culverts. Culverts will be replaced back into the stream line covered with compacted material and 7 1/2" of concrete.

Project Summary

Last Updated: 8/24/2017