Skip to main content

French Driveway and Utility Permits

A permit to construct a single lane driveway across a 34-foot length of National Forest System (NFS) land. Also includes a permit to install buried service across 440 feet by 10-foot right-of-way over NFS land.

Project Summary

Last Updated: 8/26/2010