Skip to main content

Sterling Hollow Dam

Looking at options to modify/remove the dam to lower the risk rating from high to significant or low. Options include but are not limited to: installing monitoring equipment; raise the dam; improve the spillway; lower the dam; and, remove the dam.

Project Summary

Last Updated: 6/23/2021