Proposal for the Nicor Gas Transmission Pipeline Renewal (DOA) Project- Special Use Permit
Northern Illinois GAs Company (Nicor Gas)has submitted a request to renew a sixty-six wide 3-mile easement of right-of-way (ROW) originally issued by the Department of Army in 1965. Midewin has been administering the utility ROW since 1997
Project Summary
Location Summary:
The pipeline is approximately 3 miles long on the west side of Midewin. IL 53 highway and the Union Pacific Railroad both run parallel to the pipeline on the E, adjacent grasslands are N, S and W.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 01/20/2015 |
| Decision | 09/2015 (Estimated) |
| Implementation | 10/2015 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (15)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Midewin National Tallgrass Prairie All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations; Natural Gas
Current Status:
Cancelled
Forests:
Midewin National Tallgrass Prairie
Districts:
Midewin National Tallgrass Prairie All Units
States:
Illinois
Counties:
Will
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Jeffery Martina
30239 South State Route 53
Wilmington, IL 60481
815-423-6370 Ext 232
jmartina@fs.fed.us
Last Updated: 2/20/2019