Skip to main content

Wild River Valley Trail Repairs

Repair Highwater Trail, relocate 6 small sections (~ 0.5 miles total) adjacent to Wild River damaged during Tropical Storms Irene and Sandy. Future analysis will address the Moriah Brook Trail bridge over the Wild River damaged by these storms.

Project Summary

Last Updated: 6/22/2015