Eversource X178-2 Transmission Line Rebuild and Optical Ground Wire Installation
Eversource proposes replacing about 140 wooden utility poles (i.e. structures) with steel pole equivalents in the existing ROW, as well as installing about 102,000 linear feet of Optical Ground Wire.
Project Summary
Location Summary:
Towns of Woodstock, Lincoln, and Easton in Grafton County
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 03/28/2025 |
Decision | 10/2025 (Estimated) |
Implementation | 10/2025 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (2), 36 Cfr 220.6(E)(2)
Special Authority:
Not Applicable / Other
Lead Management Unit:
White Mountain National Forest All Units
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
In Progress
Forests:
White Mountain National Forest
Districts:
Pemigewasset Ranger District
States:
New Hampshire
Counties:
Grafton
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Marianne Leberman
71 White Mountain Drive
Campton, NH 3223
603-536-6236
marianne.leberman@usda.gov
Last Updated: 3/28/2025