Long Pond Dam Repair and Maintenance
Facing the existing waterside of the dam with an 8 inch structure of poured concrete with reinforcing and anchoring (rebar or other metal pins). A new drawdown pipe will be sleeved into the existing metal pipe.
Project Summary
Location Summary:
Town of Benton, Grafton County, NH
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 09/27/2016 |
| Decision | 03/2019 (Estimated) |
| Implementation | 07/2019 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (7), 36 Cfr 220.6(E)(7)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Pemigewasset Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Facility Management; Wildlife, Fish, Rare Plants; Recreation Management
Project Activity:
Species Habitat Improvements; Facility Maintenance
Current Status:
Completed
Project Decision Information
Long Pond Dam Repair and Maintenance
Decision Signed Date: 03/15/2019
Forests:
White Mountain National Forest
Districts:
Pemigewasset Ranger District
States:
New Hampshire
Counties:
Grafton
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Ricardo Rivera
Forest Headquarters
Campton, NH 3223
603-536-6258
ricardorivera@fs.fed.us
Last Updated: 3/18/2019