Slippery Fishpass Modification

Move fishpass exit downstream and out of deposition zone so sediment and debris are washed away. Small blasting charges and rock chainsaw and hammer will be used to break up bedrock and make a new exit site (a 24" wide x 18" deep x 10' long trench).

Project Summary

Last Updated: 3/26/2015