Skip to main content

Wrangell Island Aquatic Organism Passage Culvert Replacements

Remove failing culverts and replacing with AOP designed culvert pipe, road resurfacing, riprap to stabilize/control erosion, reestablish ditches, and excavation.

Project Summary

Last Updated: 4/1/2019