Skip to main content

Nemo Saltwater Access Trail Realignment

WRD proposes to decommission the existing gravel path along the road that is between the parking area and the boardwalk trail and replace it with a trail that leads directly from the parking lot to the existing boardwalk trail.

Project Summary

Last Updated: 11/10/2021