Skip to main content

Nemo Road Stabilization

Approximately 5 miles of FS Road 6265 (Nemo-Skip Loop Road) & associated culverts will be repaired. Current wood waste road base will be replaced with more stable gravel surface, as well as other activities associated with road stabilization.

Project Summary

Last Updated: 8/14/2024