Skip to main content

9-Mile Down Stream Trail Project

Situk River Corridor Trail from 9-Mile Bridge Trailhead to the confluence with the 10-Mile Bog ATV Trail needs to be realigned. This is a user made trail, and the 10-Mile Bog drains into the Situk River near the lower part of this trail.

Project Summary

Last Updated: 6/23/2022