Skip to main content

Towers Arm Cabin Outhouse Replacement

Remove existing outhouse and replace with a new one that includes a removable basket system and a leach field. Materials would be brought to and from the site by boat via salt water. Materials would be hand carried on site (no mechanical equipment).

Project Summary

Last Updated: 3/18/2025