Juneau Hydropower Sweetheart Lake Exploratory Permit
Install two stream gauges as well as permit field surveys for studies of? fish, wildlife, botany, cultural, socio-economic, aquatic and bathymetric and lake shore analysis?.
Project Summary
Location Summary:
38 miles SE of Juneau in Gilbert Bay area, Juneau Ranger District, Juneau, Alaska
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 06/14/2010 |
Comment Period | 06/14/2010 |
Decision | 08/2010 (Estimated) |
Implementation | 01/2011 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Juneau Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Sweetheart Lake Stream Gages
Decision Signed Date: 08/24/2010
Forests:
Tongass National Forest
Districts:
Juneau Ranger District
States:
Alaska
Counties:
Juneau
Legal Land Description:
Sumdum D-5: SEC 20 and 30, T45S, R73E, CRM
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Jennifer Berger
8510 Mendenhall Loop Road
Juneau, AK 99801
907-789-6278
jberger@fs.fed.us
Last Updated: 9/28/2010