City and Borough of Sitka Application for Second Preliminary Permit, Takatz Lake Hydro Project
Re-issue 3-year SU Permit to conduct various non-ground disturbing field studies to complete feasibility studies for the proposed Takatz Lake Hydroelectric project, FERC No. 13234
Project Summary
Location Summary:
Takatz Lake, (transmission corridor across Baranof Island to Sitka, AK)
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 10/28/2011 |
Decision | 12/2011 (Estimated) |
Implementation | 01/2012 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (15)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Sitka Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Re-Issuance of a 3-year Special Use Permit for Hydroelectric Investigation
Decision Signed Date: 12/27/2011
Forests:
Tongass National Forest
Districts:
Sitka Ranger District
States:
Alaska
Counties:
Sitka
Legal Land Description:
Sections 1- 4 and 10, T. 55 S., R. 66 W., Sections 35 and 36, T. 54 S., R. 66 E., Copper River Meridian
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Clay Davis
204 Siginaka Way
Sitka, AK 99835
907-747-4225
clayrdavis@fs.fed.us
Last Updated: 3/15/2012