Zarembo Minerals Investigation 2013-2014 Plan of Operations
Use of existing roads and marine facilities, minor surface excavation, exploration, and low yield blasting, temporary crew camp and storage, foot trails, drilling access, and core drilling.
Project Summary
Location Summary:
VCUs 456,457, 458, 459. Exploration over Zarembo Island, drilling within Sections 8, 9, 16, 17 of Township 63 South, Range 80 East, CRM
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 03/28/2013 |
Comment Period | 03/28/2013 |
Decision | 07/2013 (Estimated) |
Implementation | 08/2013 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (8), 36 Cfr 220.6(E)(8)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Wrangell Ranger District
Notice and Comment Regulation:
215
Project Purpose:
Minerals And Geology
Project Activity:
Minerals Or Geology Plans Of Operations
Current Status:
Completed
Project Decision Information
Surface Exploration and Surface Drilling, Zarembo Minerals Co., 2013-2014
Decision Signed Date: 07/22/2013
Legal Notice Date: 07/25/2013
Forests:
Tongass National Forest
Districts:
Wrangell Ranger District
States:
Alaska
Counties:
Wrangell-Petersburg
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
David Rak
525 Bennett Street
Wrangell, AK 99929-0051
907-874-7566
drak@fs.fed.us
Last Updated: 9/25/2013