Kupreanof Microhydro
Proposal to issue a special use authorization to install a 6 inch diameter x 458 foot long water line, and a 3 inch diameter x 30 foot long water line attached to two instream water intake boxes to facilitate power generation to a private residence.
Project Summary
Location Summary:
Two miles southwest of Petersburg, Alaska on Kupreanof Island
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 06/08/2020 |
Decision | 08/2020 (Estimated) |
Implementation | 08/2020 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Petersburg Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Kupreanof Microhydro
Decision Signed Date: 08/04/2020
Forests:
Tongass National Forest
Districts:
Petersburg Ranger District
States:
Alaska
Counties:
Wrangell-Petersburg
Legal Land Description:
Section 32, T. 58 S., R. 79 E., Copper River Meridian
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Russell Beers
12 North Nordic Drive
Petersburg, AK 99833-1328
907-772-5940
rbeers@fs.fed.us
Last Updated: 8/4/2020