Outfitter Guide camp reconstruction in Dry Bay
Alsek River Adventures proposes to remove the existing improvements, 850 sq ft, and construct new facilities, 1600 sq ft, including flush toilets, showers, laundry, pump house, generator shed, kitchen, and bunkhouses with a boardwalk connecting them.
Project Summary
Location Summary:
Alsek River Adventures LLC, proposes removal of existing improvements, 850 square feet, and construct new, 1600 square feet,including kitchen, 2 bunkhouses, generator shed, pumphouse, and bathroom.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 07/21/2020 |
Decision | 01/2021 (Estimated) |
Implementation | 01/2021 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Yakutat Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Cancelled
Forests:
Tongass National Forest
Districts:
Yakutat Ranger District
States:
Alaska
Counties:
Yakutat
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Teresa Swanson
712 Ocean Cape Road
Yakutat, AK 99689-0327
907-784-3359
teresa.swanson@usda.gov
Last Updated: 3/19/2021