Continuation of Woodbury Water System Authorization
Continue authorizing a domestic water supply system on National Forest System land which serves a private cabin not on National Forest System land for the next 30 years (CY 2022-2051).
Project Summary
Location Summary:
.04 acres near Green Point on the mainland south of the Stikine River.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 03/25/2021 |
| Decision | 01/2022 (Estimated) |
| Implementation | 02/2022 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.12 (11), 36 Cfr 220.6(D)(11)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Wrangell Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Woodbury Water System Authorization Continuation
Decision Signed Date: 01/26/2022
Forests:
Tongass National Forest
Districts:
Wrangell Ranger District
States:
Alaska
Counties:
Wrangell-Petersburg
Legal Land Description:
Water system located within the Northwest 1/4 of the Southeast 1/4 of Sec. 31, Township 61 South, Range 84 East, Copper River Meridian
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
David Rak
525 Bennett Street
Wrangell, AK 99929-0051
907-874-7566
drak@fs.fed.us
Last Updated: 2/1/2022