Skip to main content

Couverden Homeshore Marine Access Facility Decomissioning

The proposed action is to excavate the existing causeway to a different grade that would create a graded ramp eliminate potential of the sheetpile wall failing and losing fill material into navigable waters.

Project Summary

Last Updated: 10/7/2021