SEALink South Submarine Fiber Optic Cable System
Authorize the installation, operation, and maintenance of fiber optic cable on existing utility poles along sections of the Klawock-Hollis Highway that cross NFS land (up to 7 miles), between Hollis and Klawock. No ground disturbance proposed.
Project Summary
Location Summary:
Along existing highway ROW on existing poles, from Coffman Cove to Craig.
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 08/29/2023 |
Decision | 04/2024 (Estimated) |
Implementation | 06/2024 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
40 Cfr 1506.3(D)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Craig Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
SEALink South Submarine Fiber Optic Cable System
Decision Signed Date: 04/03/2024
Forests:
Tongass National Forest
Districts:
Craig Ranger District
States:
Alaska
Counties:
Prince of Wales-Outer
Legal Land Description:
Not Applicable
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Melissa Dinsmore
504 9th Street
Craig, AK 99921-9998
907-747-4201
melissa.dinsmore@usda.gov