Gull Cove Waterline Extension
Applicant is proposing a 900-foot extension of four-inch diameter high-density polyethylene above ground water transmission pipeline on National Forest System lands to serve private property at Gull Cove, Idaho Inlet.
Project Summary
Location Summary:
Gull Cove, Idaho inlet, Chichagof Island
Project Milestones:
Milestone | Date |
---|---|
Scoping Start | 12/02/2024 |
Decision | 03/2025 (Estimated) |
Implementation | 03/2025 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Hoonah Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Special Use Authorizations
Current Status:
Completed
Project Decision Information
Gull Cove Waterline Extension
Decision Signed Date: 03/13/2025
Forests:
Tongass National Forest
Districts:
Hoonah Ranger District
States:
Alaska
Counties:
Skagway-Hoonah-Angoon
Legal Land Description:
T. 42 S., R. 57 E., sec 19, and T. 42 S., R. 57 E., sec 29 thru 30 Copper River Meridian
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Adam Hestetune
430 Airport Way
Hoonah, AK 99829-0135
907-945-1203
adam.hestetune@usda.gov
Last Updated: 3/16/2025