Blacktail Flathead Electric Powerline Corridor
Project Summary
Current Status:
Completed
Location Summary:
The Blacktail Flathead Electric Cooperative Powerline Corridor Project is located approximately four miles west of Lakeside, Montana to the top of Blacktail Mountain. The project area is entirely within the Salish Mountains Geographic Area and most of the project area is within the wildland urban interface as defined by the Flathead County Community Wildfire Protection Plan.
Project Milestones:
| Milestone | Date |
|---|---|
| NEPA Start Date | 5/2/2025 |
| Finding/Decision Date | 12/23/2025 |
Expected Analysis Type:
Categorical Exclusion
Categorical Exclusion:
Section 605 of HFRA (16 U.S.C.6591d)
Lead Management Unit:
Swan Lake Ranger District
Project Purpose:
Fuels management
Project Decision Information
Decision Signed Date: 12/23/2025
States:
Montana
Counties:
Flathead
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public