Glacier Electric Cooperative Shed 7 buried line
Glacier electric cooperative wants to bury an existing overhead electric line that is in an avalanche run-out zone near Burlington Northern Santa Fe railroad snowshed 7. The buried line will be 550 ft. from existing utility corridor.
Project Summary
Location Summary:
The project is located in the railroad right of way in John F. Stevens canyon near BNSF snowshed 7.
Project Milestones:
| Milestone | Date |
|---|---|
| Scoping Start | 10/15/2019 |
| Decision | 11/2020 (Estimated) |
| Implementation | 05/2021 (Estimated) |
Expected Analysis Type:
Decision Memo
Categorical Exclusion:
32.2 (3), 36 Cfr 220.6(E)(3)
Special Authority:
Not Applicable / Other
Lead Management Unit:
Hungry Horse Ranger District
Notice and Comment Regulation:
Not Subject to Regulations
Project Purpose:
Special Use Management
Project Activity:
Electric Transmission
Current Status:
Completed
Project Decision Information
Glacier Electric Cooperative Shed 7 buried line
Decision Signed Date: 11/18/2020
Forests:
Flathead National Forest
Districts:
Hungry Horse Ranger District
States:
Montana
Counties:
Flathead
Legal Land Description:
Section 26, T29N, R15W
Use the widget below to browse documents associated with this project. Cookies must be enabled to use this tool.
If you are using a mobile device, the setting for "Allow cross-website tracking" must also be enabled to view the documents. You do not need to sign up or login to Box to view documents, but if you have difficulty accessing the documents on a mobile device, you may choose to sign up for a free account, download the app to your device and log in to ensure that you can open the documents.
Alternatively, these documents can be accessed on the Pinyon Public website: View Documents on Pinyon Public
Sadie Wehunt
10 Hungry Horse Drive
Hungry Horse, MT 59919
406-758-5364
sadie.wehunt@usda.gov
Last Updated: 7/22/2021