Skip to main content

FAA Pumphouse Removal

The proposed actions include removing the pumphouse structure and water storage tank at the upper site and removal of a pumphouse structure, buried cistern and pipe, and chain-link fence at the lower site.

Project Summary

Last Updated: 10/20/2021