Skip to main content

BPA Fiber Optic Installation

Approximately 4.5 miles of fiber optic cables are proposed to be installed on National Forest System land on the existing Hungry Horse-Columbia Falls transmission line. Also proposed is to decommission and remove the Teakettle repeater.

Project Summary

Last Updated: 5/17/2023