Skip to main content

Tewksberry trail reroute

The proposed action is to reroute 3 sections of the Tewksberry ATV trail for a total of 1 mile. The reroutes would be constructed to ATV trail specifications with tread no wider than 50", and would reduce resource damage and soil erosion.

Project Summary

Last Updated: 4/19/2021