Facilities - McPhee Recreation Area Wastewater Disposal System

Decision is complete and implementation is underway to install a wastewater trench absorption system to replace the existing system at the McPhee Recreation Area which services the group campground loop. This system will consist of two (2) 1,500 gallon septic tanks.

Project Summary

Last Updated: 6/30/2014