Skip to main content

Minerals - BP Fruitland Coal Gas Horizontal Drilling

Temporarily expand 8 well pads using 1.4 acres of previously disturbed ground, horizontally drill 16 wells from these 8 well pads, and construct 1.6 miles of gas pipelines within prior areas of disturbance. Hydraulically fracture 4 of the 16 wells.

Project Summary

Last Updated: 9/11/2017